Active Jobs
82
Total open
Overdue
37
Past prod deadline
Material < 70%
5
Short stock
Eng Stuck
45
Avg < 30%, due ≤45d
Halted Prod
7
Prod status, 0% eng
Open HIGH Issues
3
Not DONE
Hours Over Budget
6
Used > planned
Jobs by Status
Material Readiness
Engineering Avg Progress
28%
Mechanical
22%
Electrical
6%
Service
PM Workload
Department Bottlenecks
Logistik & Admin Project
3% · n=66
Finance
4% · n=66
Warehouse
5% · n=66
QC&QA Finish Product
5% · n=86
Instalasi
5% · n=41
Production
7% · n=86
Eng Service
13% · n=40
Purchasing
15% · n=87
PPC
29% · n=91
Project Coordinator
35% · n=96
Eng Electrical
38% · n=78
Eng Mechanical
41% · n=79
CRO/Admin Sales
42% · n=67
Production Deadlines per Week
Actionable Plans
highengineeringrule
Push engineering: INTERNAL | - MDCC Trial Full Schneider Device - Container
Eng avg 2% (mech 3%, elec 1%) with prod due in 10d.
highproductionrule
OVERDUE: Hitachi - ACP24031 - 500kV Waru
Production deadline passed 173d ago. Status: QC. PM: Fatma Afira Heryani.
highproductionrule
OVERDUE: GSPE_Smart Rack (Micro Data Center)
Production deadline passed 11d ago. Status: Production. PM: Annisa Widya.
highengineeringrule
Push engineering: PT. NexWave_Panel TXDP & SDP AC_PO25090188
Eng avg 0% (mech 0%, elec 0%) with prod due in 24d.
highproductionrule
OVERDUE: Internal - Stock Rack Server Moratel & DCPDU
Production deadline passed 123d ago. Status: Production. PM: May Sarah.
highengineeringrule
Push engineering: Internal - Stock Rack Server Moratel & DCPDU
Eng avg 5% (mech 9%, elec 0%) with prod due in -123d.
highproductionrule
OVERDUE: Internal - Pembuatan Bak Treatment, Hoist, Oven dan Trolley
Production deadline passed 19d ago. Status: Production. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Pembuatan Bak Treatment, Hoist, Oven dan Trolley
Eng avg 3% (mech 3%, elec 2%) with prod due in -19d.
highproductionrule
OVERDUE: Hitachi - ACP25039 - PHR Mobile Substation
Production deadline passed 77d ago. Status: QC. PM: Fatma Afira Heryani.
highproductionrule
OVERDUE: Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KW
Production deadline passed 49d ago. Status: QC. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Forecast Rack Server : (42U, 45U, 52U)
Eng avg 0% (mech 0%, elec 0%) with prod due in 10d.
highproductionrule
Production halted: Internal - Forecast Rack Server : (42U, 45U, 52U)
Status says Production but mech & elec engineering both 0%. Needs attention from PM Annisa Widya.
highproductionrule
OVERDUE: Schneider - GI Unaha
Production deadline passed 1d ago. Status: Production. PM: May Sarah.
highproductionrule
OVERDUE: Schneider - GI Lolak
Production deadline passed 1d ago. Status: Production. PM: May Sarah.
highproductionrule
OVERDUE: BDX - CGK1_RACK SERVER & rPDU
Production deadline passed 115d ago. Status: Production, Purchasing, Engineering. PM: Adinda Diva Nurintan Putri Irawan.
highproductionrule
OVERDUE: Internal - Stock Box Container 40 Feet ( 10 Unit)
Production deadline passed 81d ago. Status: Engineering. PM: Annisa Widya.
highproductionrule
OVERDUE: Inti Bumi Mas - Panel VFD 132KW
Production deadline passed 60d ago. Status: Customer, Engineering. PM: Fatma Afira Heryani.
highproductionrule
OVERDUE: Internal - Micro Data Centre Eaton
Production deadline passed 116d ago. Status: n/a. PM: Annisa Widya.
highproductionrule
OVERDUE: Pembuatan Robot AGV
Production deadline passed 67d ago. Status: Engineering. PM: Annisa Widya.
highproductionrule
OVERDUE: Kelinci Mas - GI SIlae & Unaaha
Production deadline passed 1d ago. Status: Production. PM: Muhamad Adam.
highproductionrule
OVERDUE: Internal - Mini Data Center Rack (MDCR) from Scheneider
Production deadline passed 53d ago. Status: Engineering. PM: Annisa Widya.
highproductionrule
OVERDUE: Internal - Layout Penambahan Unit Mesin HSG
Production deadline passed 102d ago. Status: Engineering. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Layout Penambahan Unit Mesin HSG
Eng avg 0% (mech 0%, elec 0%) with prod due in -102d.
highproductionrule
OVERDUE: Internal - Persiapan Layout Produksi MV
Production deadline passed 81d ago. Status: Engineering. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Persiapan Layout Produksi MV
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Internal - Pembuatan Program Proyek OKR/Internal Project
Production deadline passed 81d ago. Status: Engineering. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Pembuatan Program Proyek OKR/Internal Project
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Internal - Project ISO_27001
Production deadline passed 81d ago. Status: Engineering. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Project ISO_27001
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Internal - Program Estimator (Containment, Container, Smart Rack)
Production deadline passed 81d ago. Status: Engineering. PM: Susy Verawaty.
highengineeringrule
Push engineering: Internal - Program Estimator (Containment, Container, Smart Rack)
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Internal - Automation Program CRM Section 1-4
Production deadline passed 81d ago. Status: Engineering. PM: Susy Verawaty.
highengineeringrule
Push engineering: Internal - Automation Program CRM Section 1-4
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Internal - 29 Line Assembly
Production deadline passed 81d ago. Status: Engineering. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - 29 Line Assembly
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highengineeringrule
Push engineering: Internal - Perbaikan Loading/Unloading Area Pintu Belakang
Eng avg 0% (mech 0%, elec 0%) with prod due in 3d.
highproductionrule
OVERDUE: Internal - Skill Development (Training) HV
Production deadline passed 81d ago. Status: n/a. PM: Annisa Widya.
highengineeringrule
Push engineering: Internal - Skill Development (Training) HV
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Review Product Presentation - Marketing Update
Production deadline passed 81d ago. Status: n/a. PM: Annisa Widya.
highengineeringrule
Push engineering: Review Product Presentation - Marketing Update
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Pembuatan Arsip Master Dokumen Project
Production deadline passed 81d ago. Status: n/a. PM: Annisa Widya.
highengineeringrule
Push engineering: Pembuatan Arsip Master Dokumen Project
Eng avg 0% (mech 0%, elec 0%) with prod due in -81d.
highproductionrule
OVERDUE: Mega Akses - BDF Lippo Cikarang
Production deadline passed 18d ago. Status: Production. PM: Raden Aldi Rizky Fadhilah.
highproductionrule
OVERDUE: MSG - CMS Phase 2
Production deadline passed 63d ago. Status: Customer. PM: Muhamad Adam.
highengineeringrule
Push engineering: Siemens - UCC BP Tangguh
Eng avg 7% (mech 14%, elec 0%) with prod due in 17d.
highengineeringrule
Push engineering: Intan Mufakat Raya - GIS 150 KV Gandul II/Pamulang
Eng avg 0% (mech 0%, elec 0%) with prod due in 22d.
highproductionrule
OVERDUE: Schneider - Ariobimo Phase 2
Production deadline passed 53d ago. Status: Production. PM: May Sarah.
highproductionrule
OVERDUE: Hitachi - ACP25076 - Single Phi Barru
Production deadline passed 1d ago. Status: Production. PM: Fatma Afira Heryani.
highproductionrule
OVERDUE: Hitachi - ACP25070 - GI 150kV Gombong
Production deadline passed 1d ago. Status: Customer. PM: Fatma Afira Heryani.
highproductionrule
Production halted: Schneider Electric - LNGPP
Status says Production but mech & elec engineering both 0%. Needs attention from PM May Sarah.
highengineeringrule
Push engineering: PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - Sentul
Eng avg 6% (mech 0%, elec 12%) with prod due in 13d.
highproductionrule
OVERDUE: Siemens - Marvel
Production deadline passed 21d ago. Status: Engineering. PM: May Sarah.
highproductionrule
OVERDUE: Hitachi - ACP25029 - GI Tolinggula 150kV
Production deadline passed 4d ago. Status: n/a. PM: Fatma Afira Heryani.
highproductionrule
OVERDUE: Yanghong Konstruksi Indonesia - Containment BDX CGK3A
Production deadline passed 10d ago. Status: Engineering, Production. PM: Muhamad Adam.
highproductionrule
OVERDUE: Mega Akses - BDF Sudirman Condominium
Production deadline passed 4d ago. Status: Engineering. PM: Raden Aldi Rizky Fadhilah.
highengineeringrule
Push engineering: Mega Akses - BDF Sudirman Condominium
Eng avg 0% (mech 0%, elec 0%) with prod due in -4d.
highproductionrule
OVERDUE: INTERNAL-Ruang Meeting Smart Room
Production deadline passed 36d ago. Status: n/a. PM: Cahyarani Bratandari Suhardi.
highengineeringrule
Push engineering: INTERNAL-Ruang Meeting Smart Room
Eng avg 0% (mech 0%, elec 0%) with prod due in -36d.
highproductionrule
OVERDUE: Wang Jun - Fiberhome - E06F10 CABINET (90x470x370)
Production deadline passed 21d ago. Status: n/a. PM: Fatma Afira Heryani.
highengineeringrule
Push engineering: Wang Jun - Fiberhome - E06F10 CABINET (90x470x370)
Eng avg 0% (mech 0%, elec 0%) with prod due in -21d.
highengineeringrule
Push engineering: Moratel - Graha 9 Phase 2
Eng avg 0% (mech 0%, elec 0%) with prod due in 27d.
highproductionrule
OVERDUE: Mega Akses - Colocation Space Rack Tj. Bemban Gedung Baru
Production deadline passed 19d ago. Status: n/a. PM: Raden Aldi Rizky Fadhilah.
highengineeringrule
Push engineering: Mega Akses - Colocation Space Rack Tj. Bemban Gedung Baru
Eng avg 0% (mech 0%, elec 0%) with prod due in -19d.
highengineeringrule
Push engineering: Omadata - Closed Rack 19inch 42U
Eng avg 0% (mech 0%, elec 0%) with prod due in 31d.
highproductionrule
Production halted: Omadata - Closed Rack 19inch 42U
Status says Production but mech & elec engineering both 0%. Needs attention from PM Muhamad Adam.
highproductionrule
OVERDUE: Mega Akses - POP Pemurus Dalam Banjarmasin
Production deadline passed 12d ago. Status: Production. PM: Raden Aldi Rizky Fadhilah.
highengineeringrule
Push engineering: Mega Akses - POP Pemurus Dalam Banjarmasin
Eng avg 0% (mech 0%, elec 0%) with prod due in -12d.
highproductionrule
Production halted: Mega Akses - POP Pemurus Dalam Banjarmasin
Status says Production but mech & elec engineering both 0%. Needs attention from PM Raden Aldi Rizky Fadhilah.
highengineeringrule
Push engineering: PT. Tekno Infrastruktur Sukses_Batch 1.1
Eng avg 0% (mech 0%, elec 0%) with prod due in 14d.
highproductionrule
Production halted: PT. Tekno Infrastruktur Sukses_Batch 1.1
Status says Production but mech & elec engineering both 0%. Needs attention from PM Susy Verawaty.
highproductionrule
Production halted: Mega Akses Persada - BDF Power BDF Cikutra
Status says Production but mech & elec engineering both 0%. Needs attention from PM Raden Aldi Rizky Fadhilah.
highproductionrule
OVERDUE: Taybo - Rack Server 52U_Mockup
Production deadline passed 8d ago. Status: Customer. PM: Annisa Widya.
highengineeringrule
Push engineering: Taybo - Rack Server 52U_Mockup
Eng avg 0% (mech 0%, elec 0%) with prod due in -8d.
highengineeringrule
Push engineering: JKT2 Anex Data Center - Rack 45U & Basic PDU
Eng avg 0% (mech 0%, elec 0%) with prod due in 31d.
highproductionrule
Production halted: JKT2 Anex Data Center - Rack 45U & Basic PDU
Status says Production but mech & elec engineering both 0%. Needs attention from PM Adinda Diva Nurintan Putri Irawan.
highengineeringrule
Push engineering: Hexa Daya Solusi - Rack 48U
Eng avg 0% (mech 0%, elec 0%) with prod due in 3d.
highproductionrule
OVERDUE: Wholesale - Panel DB - Dermaga Biak
Production deadline passed 6d ago. Status: Customer. PM: Fatma Afira Heryani.
highengineeringrule
Push engineering: Wholesale - Panel DB - Dermaga Biak
Eng avg 0% (mech 0%, elec 0%) with prod due in -6d.
highengineeringrule
Push engineering: Multipolar TMS - Relokasi Rectifier
Eng avg 0% (mech 0%, elec 0%) with prod due in 42d.
highcustomerrule
Resolve Customer issue (OUTS): Siemens - UCC BP Tangguh
1. Approval Drawing GA panel masih dalam proses revisi dari Siemens dan sedang di perbaiki oleh tim engineer GSPE
2. Untuk top plate, akan confirm dalam satu pekan ke depan oleh Siemens karena masih perlu diskusi dengan customer (JGC).
3. GA Cutout belum dikrimkan oleh Siemens k... -- Action: 1. Follow up engineering untuk revisi approval drawing Ga panel dari customer
2. Follow up customer terkait konfirmasi top plate panel
3. Follow up customer terkait GA cutout dan konfirmasi nameplate
highmaterialrule
Resolve Material issue (OUTS): Schneider - GI Lolak
1. Terdapat perbedaan tag komponen antara drawing dan schematic -- Action: 1. Koordinasi dengan tim engineering untuk penyesuaian drsawing dengan schematic
2. Follow up customer untuk update drawing yang sudah disesuaikan dengan schematic
highcustomerrule
Resolve Customer issue (OUTS): PT Telin - Instalasi CLS Pluit
Tray dari ruang MMR A ke MMR B belum terpasang, estimasi pemasangan di tanggal 30 maret 2026 karena vendor sudah libur (informasi dari Pak Darma) -- Action: Followup customer, untuk makesure pemasangan tray di tgl 30 maret agar tidak terjadi lagi delay instalasi
highotherrule
Systemic bottleneck: Logistik & Admin Project
Avg 3% across 66 project templates. Reallocate or escalate.
highotherrule
Systemic bottleneck: Finance
Avg 4% across 66 project templates. Reallocate or escalate.
medcustomerrule
Chase customer approval: INTERNAL | - MDCC Trial Full Schneider Device - Container
Customer approval still pending with prod in 10d.
medcustomerrule
Chase customer approval: Hitachi - ACP24031 - 500kV Waru
Customer approval still pending with prod in -173d.
medcustomerrule
Chase customer approval: Schneider - Panel for PUSRI IIIB Project // E2010-96440
Customer approval still pending with prod in 7d.
medengineeringrule
Push engineering: GSPE_Smart Rack (Micro Data Center)
Eng avg 24% (mech 14%, elec 33%) with prod due in -11d.
medcustomerrule
Chase customer approval: GSPE_Smart Rack (Micro Data Center)
Customer approval still pending with prod in -11d.
medmaterialrule
Follow up materials: PT. NexWave_Panel TXDP & SDP AC_PO25090188
Material readiness 63% (167/263) with prod due in 24d. PM Susy Verawaty.
medcustomerrule
Chase customer approval: PT. NexWave_Panel TXDP & SDP AC_PO25090188
Customer approval still pending with prod in 24d.
medcustomerrule
Chase customer approval: Kelinci Mas - DSS Tallolama
Customer approval still pending with prod in 9d.
medcustomerrule
Chase customer approval: Hitachi - ACP25026 - Balongan
Customer approval still pending with prod in 10d.
medotherrule
Hours over budget: Internal - Stock Rack Server Moratel & DCPDU
142h used vs 44h budgeted (323%).
medcustomerrule
Chase customer approval: Internal - Stock Rack Server Moratel & DCPDU
Customer approval still pending with prod in -123d.
medengineeringrule
Push engineering: Internal - Contaiment 50 Unit
Eng avg 29% (mech 33%, elec 25%) with prod due in 42d.
medotherrule
Hours over budget: Internal - Contaiment 50 Unit
163h used vs 98h budgeted (167%).
medcustomerrule
Chase customer approval: Internal - Pembuatan Bak Treatment, Hoist, Oven dan Trolley
Customer approval still pending with prod in -19d.
medcustomerrule
Chase customer approval: Hitachi - ACP25035 - GI Satui 150kV
Customer approval still pending with prod in 10d.
medotherrule
Hours over budget: Hitachi - ACP25039 - PHR Mobile Substation
137h used vs 133h budgeted (103%).
medcustomerrule
Chase customer approval: Hitachi - ACP25039 - PHR Mobile Substation
Customer approval still pending with prod in -77d.
medcustomerrule
Chase customer approval: Schneider - GI Tobelo PO# 2103 735815
Customer approval still pending with prod in 10d.
medengineeringrule
Push engineering: Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KW
Eng avg 25% (mech 28%, elec 22%) with prod due in -49d.
medcustomerrule
Chase customer approval: Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KW
Customer approval still pending with prod in -49d.
medotherrule
Hours over budget: Internal - Forecast Rack Server : (42U, 45U, 52U)
216h used vs 77h budgeted (279%).
medcustomerrule
Chase customer approval: Internal - Forecast Rack Server : (42U, 45U, 52U)
Customer approval still pending with prod in 10d.
medcustomerrule
Chase customer approval: Schneider - GI Unaha
Customer approval still pending with prod in -1d.
medcustomerrule
Chase customer approval: Schneider - GI Lolak
Customer approval still pending with prod in -1d.
medcustomerrule
Chase customer approval: BDX - CGK1_RACK SERVER & rPDU
Customer approval still pending with prod in -115d.
medcustomerrule
Chase customer approval: BDX - CGK1_Panel PDU
Customer approval still pending with prod in 2d.
medcustomerrule
Chase customer approval: Internal - Stock Box Container 40 Feet ( 10 Unit)
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Inti Bumi Mas - Panel VFD 132KW
Customer approval still pending with prod in -60d.
medengineeringrule
Push engineering: Internal - Micro Data Centre Eaton
Eng avg 11% (mech 0%, elec 22%) with prod due in -116d.
medcustomerrule
Chase customer approval: Internal - Micro Data Centre Eaton
Customer approval still pending with prod in -116d.
medengineeringrule
Push engineering: Internal - Smart rPDU
Eng avg 11% (mech 0%, elec 22%) with prod due in 10d.
medcustomerrule
Chase customer approval: Internal - Smart rPDU
Customer approval still pending with prod in 10d.
medengineeringrule
Push engineering: Pembuatan Robot AGV
Eng avg 13% (mech 14%, elec 11%) with prod due in -67d.
medcustomerrule
Chase customer approval: Pembuatan Robot AGV
Customer approval still pending with prod in -67d.
medcustomerrule
Chase customer approval: Kelinci Mas - GI SIlae & Unaaha
Customer approval still pending with prod in -1d.
medengineeringrule
Push engineering: Internal - Mini Data Center Rack (MDCR) from Scheneider
Eng avg 13% (mech 14%, elec 11%) with prod due in -53d.
medcustomerrule
Chase customer approval: Internal - Mini Data Center Rack (MDCR) from Scheneider
Customer approval still pending with prod in -53d.
medcustomerrule
Chase customer approval: Internal - Layout Penambahan Unit Mesin HSG
Customer approval still pending with prod in -102d.
medcustomerrule
Chase customer approval: Internal - Persiapan Layout Produksi MV
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Internal - Pembuatan Program Proyek OKR/Internal Project
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Internal - Project ISO_27001
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Internal - Program Estimator (Containment, Container, Smart Rack)
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Internal - Automation Program CRM Section 1-4
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Internal - 29 Line Assembly
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Internal - Perbaikan Loading/Unloading Area Pintu Belakang
Customer approval still pending with prod in 3d.
medcustomerrule
Chase customer approval: Internal - Skill Development (Training) HV
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Review Product Presentation - Marketing Update
Customer approval still pending with prod in -81d.
medcustomerrule
Chase customer approval: Pembuatan Arsip Master Dokumen Project
Customer approval still pending with prod in -81d.
medengineeringrule
Push engineering: Mega Akses - BDF Lippo Cikarang
Eng avg 25% (mech 50%, elec 0%) with prod due in -18d.
medcustomerrule
Chase customer approval: Mega Akses - BDF Lippo Cikarang
Customer approval still pending with prod in -18d.
medcustomerrule
Chase customer approval: Moratel - DC Dist Site BSD SM+
Customer approval still pending with prod in 3d.
medmaterialrule
Follow up materials: MSG - CMS Phase 2
Material readiness 65% (17/26) with prod due in -63d. PM Muhamad Adam.
medengineeringrule
Push engineering: MSG - CMS Phase 2
Eng avg 20% (mech 40%, elec 0%) with prod due in -63d.
medcustomerrule
Chase customer approval: MSG - CMS Phase 2
Customer approval still pending with prod in -63d.
medotherrule
Hours over budget: Siemens - UCC BP Tangguh
130h used vs 43h budgeted (306%).
medcustomerrule
Chase customer approval: Siemens - UCC BP Tangguh
Customer approval still pending with prod in 17d.
medcustomerrule
Chase customer approval: Intan Mufakat Raya - GIS 150 KV Gandul II/Pamulang
Customer approval still pending with prod in 22d.
medcustomerrule
Chase customer approval: Schneider - Ariobimo Phase 2
Customer approval still pending with prod in -53d.
medcustomerrule
Chase customer approval: Hitachi - ACP25076 - Single Phi Barru
Customer approval still pending with prod in -1d.
medcustomerrule
Chase customer approval: Hitachi - ACP25070 - GI 150kV Gombong
Customer approval still pending with prod in -1d.
medotherrule
Hours over budget: Schneider Electric - LNGPP
368h used vs 70h budgeted (526%).
medcustomerrule
Chase customer approval: Moratel - POP Kebayoran Lama
Customer approval still pending with prod in 10d.
medmaterialrule
Follow up materials: PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - Sentul
Material readiness 62% (205/330) with prod due in 13d. PM Raden Aldi Rizky Fadhilah.
medcustomerrule
Chase customer approval: PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - Sentul
Customer approval still pending with prod in 13d.
medcustomerrule
Chase customer approval: Hitachi - ACP26008 - GIS 150kV JIIPE BKMS Tenant
Customer approval still pending with prod in 10d.
medmaterialrule
Follow up materials: Moratel - Site Kuala Tungkal
Material readiness 68% (159/233) with prod due in 15d. PM May Sarah.
medcustomerrule
Chase customer approval: Moratel - Site Kuala Tungkal
Customer approval still pending with prod in 15d.
medcustomerrule
Chase customer approval: Siemens - Marvel
Customer approval still pending with prod in -21d.
medengineeringrule
Push engineering: PT. Tekno Infrastruktur Sukses_MOCKUP_BPO
Eng avg 20% (mech 28%, elec 11%) with prod due in 3d.
medcustomerrule
Chase customer approval: PT. Tekno Infrastruktur Sukses_MOCKUP_BPO
Customer approval still pending with prod in 3d.
medcustomerrule
Chase customer approval: Hitachi - ACP25029 - GI Tolinggula 150kV
Customer approval still pending with prod in -4d.
medengineeringrule
Push engineering: EEI - MK GI Paringin
Eng avg 25% (mech 25%, elec 25%) with prod due in 41d.
medcustomerrule
Chase customer approval: Yanghong Konstruksi Indonesia - Containment BDX CGK3A
Customer approval still pending with prod in -10d.
medcustomerrule
Chase customer approval: Mega Akses - BDF Sudirman Condominium
Customer approval still pending with prod in -4d.
medcustomerrule
Chase customer approval: INTERNAL-Ruang Meeting Smart Room
Customer approval still pending with prod in -36d.
medmaterialrule
Follow up materials: Wang Jun - Fiberhome - E06F10 CABINET (90x470x370)
Material readiness 66% (2/3) with prod due in -21d. PM Fatma Afira Heryani.
medcustomerrule
Chase customer approval: Wang Jun - Fiberhome - E06F10 CABINET (90x470x370)
Customer approval still pending with prod in -21d.
medcustomerrule
Chase customer approval: Kelinci Mas Unggul - Panel MK Single Phi
Customer approval still pending with prod in 22d.
medengineeringrule
Push engineering: Moratel - CLS Mandalika
Eng avg 17% (mech 0%, elec 33%) with prod due in 20d.
medcustomerrule
Chase customer approval: Moratel - CLS Mandalika
Customer approval still pending with prod in 20d.
medcustomerrule
Chase customer approval: Moratel - Graha 9 Phase 2
Customer approval still pending with prod in 27d.
medcustomerrule
Chase customer approval: Mega Akses - Colocation Space Rack Tj. Bemban Gedung Baru
Customer approval still pending with prod in -19d.
medcustomerrule
Chase customer approval: Mega Akses - POP Pemurus Dalam Banjarmasin
Customer approval still pending with prod in -12d.
medcustomerrule
Chase customer approval: PT. Tekno Infrastruktur Sukses_Batch 1.1
Customer approval still pending with prod in 14d.
medengineeringrule
Push engineering: Hitachi - ACP26018 - GI KM17 Borneo Indobara
Eng avg 25% (mech 50%, elec 0%) with prod due in 35d.
medcustomerrule
Chase customer approval: Taybo - Rack Server 52U_Mockup
Customer approval still pending with prod in -8d.
medcustomerrule
Chase customer approval: Hexa Daya Solusi - Rack 48U
Customer approval still pending with prod in 3d.
medcustomerrule
Chase customer approval: Wholesale - Panel DB - Dermaga Biak
Customer approval still pending with prod in -6d.
Job Issues (18)
HIGHOUTSCustomerSiemens - UCC BP Tangguh
1. Approval Drawing GA panel masih dalam proses revisi dari Siemens dan sedang di perbaiki oleh tim engineer GSPE
2. Untuk top plate, akan confirm dalam satu pekan ke depan oleh Siemens karena masih perlu diskusi dengan customer (JGC).
3. GA Cutout belum dikrimkan oleh Siemens ke GSPE
4. Belum ada konfirmasi terkait nameplate & mimic dari Siemens
Action: 1. Follow up engineering untuk revisi approval drawing Ga panel dari customer
2. Follow up customer terkait konfirmasi top plate panel
3. Follow up customer terkait GA cutout dan konfirmasi nameplate & mimic
HIGHOUTSMaterialSchneider - GI Lolak
1. Terdapat perbedaan tag komponen antara drawing dan schematic
Action: 1. Koordinasi dengan tim engineering untuk penyesuaian drsawing dengan schematic
2. Follow up customer untuk update drawing yang sudah disesuaikan dengan schematic
HIGHOUTSCustomerPT Telin - Instalasi CLS Pluit
Tray dari ruang MMR A ke MMR B belum terpasang, estimasi pemasangan di tanggal 30 maret 2026 karena vendor sudah libur (informasi dari Pak Darma)
Action: Followup customer, untuk makesure pemasangan tray di tgl 30 maret agar tidak terjadi lagi delay instalasi
HIGHDONEMaterialSchneider - Panel for PUSRI IIIB ProjectE2010-96440
Adanya pergantian material fan, lampu beserta accessories karena mengikuti sistem existing karena adanya perubahan schematic dari customer
Action: Koordinasi dengan tim engineering untuk dibuatkan BOQ untuk tambahan material
Koordinasi dengan estimator untuk price list material
HIGHDONEMaterialSchneider - GI Tobelo PO# 2103 735815
DIperlukan penggantian ukuran cable duct sesuai dengan stock yang trsedia di GSPE, karena ukuran cable duct yang diajukan oleh customer tidak tersedia di supplier dan inden lama
1. 80x80 ganti ke 70x100
2. 60x80 ganti ke 65x65
3. 40x80 ganti ke 45x65
Action: 1. Koordinasi dengan tim engineering untuk dibuatkan drawing simulasi sesuai dengan ukuran cable duct yang tersedia di GSPE
2. Konfirmasi ke customer untuk penggantian ukuran cable duct dengan melampiran drawing simulasi
HIGHDONECustomerSchneider - Panel for PUSRI IIIB ProjectE2010-96440
1. Terdapat tambahan part di panel CCR EPMS, perlu wiring lagi dan tambah Din Rail - request customer
2. Material tambahan penggunakan material untuk panel LLS terlebih dahulu
Action: 1. Koordinasi dengan tim engineering untuk update schematic
2. Revisi penambahan material untuk panel EPMS CCR Room menggunakan material panel LLS terlebih dahulu
List material yang digunakan:
- cable duct 45x65 (1 batang)
- dinrail (1 batang)
- MCB 6a 2p (2pcs)
- ethernet switch (2pcs)
HIGHDONECustomerSchneider - Panel for PUSRI IIIB ProjectE2010-96440
1. Terdapat permintaan untuk tambahan slider dari customer untuk server pada panel CCR Room EPMS, sedangkan tidak ada permintaan slider pada layout awal, hanya ada perrmintaan untuk support
2. Posisi LKVM untuk panel CCR Room EPMS pada saat dibuka mentok dengan T500, untuk itu diperlukan perubahan layout pada panel tersebut.
Action: 1. Koordinas dengan PPC akan ada penambahan frame RU dibagian belakang panel - butuh konfirmasi ke customer terlebih dahulu
2. Koordinasi dengan tim engineering untuk update layout panel untuk perubahan posisi LKVM
HIGHDONEMaterialMoratel - DC Dist Site BSD SM+
1. Komponen dari brand socomec indent sampai dengan 16 April 2026
2. Sudah konfirmasi ke customer dan dari customer minta surat inden dari supplier
Action: 1. Follow up purchasing untuk surat pernyataan indent dari supplier untuk komponen terkait
HIGHDONEMaterialSchneider - GI Unaha
1. Tidak bisa menggunakan relay metal clamp karena indent terlalu lama di supplier, tetapi tidak berpengaruh terhadap fungsional panel
Action: 1. Konfirmasi ke customer terkait penggunaaan material dna status inden material relay metal clamp
HIGHDONEMaterialSchneider - GI Unaha
1. Material terminal UK5 MTK diganti ke di UK5 MTKPP yang serupa karena terminal UK5 MTK tidak ready di supplier
Action: 1. Konfirmasi ke customer terkait pergantian material tersebut agar bisa segera di proses
HIGHDONEMaterialSchneider - GI Lolak
1. Material terminal UK5 MTK diganti ke di UK5 MTKPP yang serupa karena terminal UK5 MTK tidak ready di supplier
Action: 1. Konfirmasi ke customer terkait pergantian material tersebut agar bisa segera di proses
HIGHDONEMaterialSchneider - GI Lolak
1. Perubahan ukuran pada cable duct mengikuti stock yang tersedia di GSPE karena untuk cable duct dengan ukuran dari customer inden di supplier
Action: 1. Koordinasi dengan tim engineering untuk dibuatkan drawing simulasi perubahan ukuran kabel duct
2. Konfirmasi dengan customer terkait perubahan ukuran kabel duct
HIGHDONEMaterialSchneider - GI Tobelo PO# 2103 735815
1. Kekurangan komponen dari customer (1 komponen - kwh meter)
Action: 1. Follow up customer untuk jadwal pengiriman komponen tersebut
HIGHDONEMaterialBDX - CGK1_Panel PDU
Terdapat Indent pada Material MCB dan Auxiliary yang sesuai dengan BOQ, sehingga diperlukan material temporary untuk FAT dan Delivery ke site
Action: Mengganti material dengan MCB dan Auxiliary Schneider dengan rating sesuai sampai material permanen tiba di GSPE dan dikirim ke site untuk dilakukan penukaran material terpasang.
HIGHDONEMaterialPT Telin - Instalasi CLS Pluit
Flexible conduit yang dibutuhkan 50 Meter yang datang 5 Meter, sehingga perlu waktu untuk pembelian kekurangan flexible conduit (kurang lebih 5 hari)
Action: Melakukan proses PR dan PO Ulang untuk melengkapi kekurangan quantity flexible conduit
HIGHDONEMaterialPT Telin - Instalasi CLS Pluit
Konektor pipa dan conduit yang datang ke GSPE salah, sehingga perlu waktu untuk retur material (kurang lebih 4-5 hari)
Action: Retur material connector pipa, agar pipa dan conduit dapat terpasang dan tersambung
HIGHDONEMaterialPT Telin - Instalasi CLS Pluit
Hanger pipa yang dibeli type nya salah, sehingga perlu waktu untuk pembelian sesuai dengan type di BOQ (kurang lebih 7 hari)
Action: Melakukan pembelian hanger pipa yg sesuai dengan list pada BOQ PO
HIGHDONECustomerPT Telin - Instalasi CLS Pluit
Lubang pipa di dinding meleset/belum simetris sesuai dengan kebutuhan untuk pemasangan pipa dan conduit
Action: Follouwp customer dan meminta untuk perbaikan lubang pipa, agar pemasangan instalasi pipa sesuai dengan design drawing
Jobs (82)
| # | Project | PM | Priority | Status | Prod Due | Mech | Elec | Material | Hrs util |
|---|---|---|---|---|---|---|---|---|---|
| 1 | INTERNAL | - MDCC Trial Full Schneider Device - Container - · INTERNAL | Annisa Widya | High | Production | May 29, 2610d | 2/63 | 1/81 | 169/225 | 6% |
| 2 | Hitachi - ACP24031 - 500kV Waru Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | QC | Nov 27, 25173d late | 4/10 | 4/9 | 126/158 | 70% |
| 3 | Internal - MDCC 20 Feet POD Phase 2/IP65 - · INTERNAL | Annisa Widya | Low | Engineering | Jun 30, 2642d | 2/7 | 3/9 | — | 0% |
| 4 | Schneider - Panel for PUSRI IIIB Project // E2010-96440 Schneider Indonesia PT · PPC | May Sarah | High | ProductionEngineeringCustomer | May 26, 267d | 8/11 | 4/9 | 131/164 | 54% |
| 5 | GSPE_Smart Rack (Micro Data Center) - · INTERNAL | Annisa Widya | Medium | Production | May 8, 2611d late | 1/7 | 3/9 | 31/37 | 0% |
| 6 | PT. NexWave_Panel TXDP & SDP AC_PO25090188 - · PPC | Susy Verawaty | High | CustomerEngineering | Jun 12, 2624d | 0/7 | 0/9 | 167/263 | 5% |
| 7 | Kelinci Mas - DSS Tallolama Kelinci Mas Unggul PT · PPC | Muhamad Adam | Medium | FAT | May 28, 269d | 8/11 | 7/9 | 173/204 | 44% |
| 8 | Hitachi - ACP25026 - Balongan Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | QC | May 29, 2610d | 3/11 | 4/9 | 162/181 | 85% |
| 9 | Internal - Stock Rack Server Moratel & DCPDU - · PPC | May Sarah | Low | Production | Jan 16, 26123d late | 1/11 | 0/9 | — | 323% |
| 10 | Internal - Contaiment 50 Unit - · INTERNAL | Annisa Widya | Low | Production | Jun 30, 2642d | 2/6 | 2/8 | 108/133 | 167% |
| 11 | Internal - Pembuatan Bak Treatment, Hoist, Oven dan Trolley - · INTERNAL | Annisa Widya | Low | Production | Apr 30, 2619d late | 1/28 | 1/36 | — | — |
| 12 | Hitachi - ACP25035 - GI Satui 150kV Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Low | QC | May 29, 2610d | 3/11 | 4/9 | 152/169 | 68% |
| 13 | Hitachi - ACP25039 - PHR Mobile Substation Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | QC | Mar 3, 2677d late | 4/11 | 4/9 | 125/139 | 103% |
| 14 | Schneider - GI Tobelo PO# 2103 735815 Schneider Indonesia PT · PPC | May Sarah | Medium | Production | May 29, 2610d | 4/10 | 5/6 | 148/190 | 83% |
| 15 | Mock Up - PT. Enerkomp Persada Raya Panel Soft Starter 250KW - · INTERNAL | Annisa Widya | High | QC | Mar 31, 2649d late | 2/7 | 2/9 | 48/64 | 27% |
| 16 | Internal - Forecast Rack Server : (42U, 45U, 52U) - · PPC | Annisa Widya | Low | EngineeringProduction | May 29, 2610d | 0/21 | 0/27 | — | 279% |
| 17 | Schneider - GI Unaha Schneider Indonesia PT · PPC | May Sarah | Low | Production | May 18, 261d late | 4/4 | 5/5 | 133/150 | 57% |
| 18 | Schneider - GI Lolak Schneider Indonesia PT · PPC | May Sarah | Low | Production | May 18, 261d late | 4/7 | 5/9 | 139/162 | 47% |
| 19 | BDX - CGK1_RACK SERVER & rPDU Starone Mitra Telekomunikasi PT · PPC | Adinda Diva Nurintan Putri Irawan | High | ProductionPurchasingEngineering | Jan 24, 26115d late | 6/7 | 0/2 | 47/49 | 63% |
| 20 | BDX - CGK1_Panel PDU Starone Mitra Telekomunikasi PT · PPC | Adinda Diva Nurintan Putri Irawan | High | ProductionPurchasing | May 21, 262d | 6/14 | 8/18 | 126/170 | 25% |
| 21 | Internal - Stock Box Container 40 Feet ( 10 Unit) - · INTERNAL | Annisa Widya | Low | Engineering | Feb 27, 2681d late | 2/2 | 0/0 | — | — |
| 22 | Inti Bumi Mas - Panel VFD 132KW Inti Bumi Mas PT · PPC | Fatma Afira Heryani | Low | CustomerEngineering | Mar 20, 2660d late | 4/4 | 5/6 | 33/45 | 0% |
| 23 | Internal - Micro Data Centre Eaton - · INTERNAL | Annisa Widya | Low | — | Jan 23, 26116d late | 0/7 | 2/9 | — | — |
| 24 | Internal - Smart rPDU - · INTERNAL | Annisa Widya | Low | — | May 29, 2610d | 0/7 | 2/9 | 16/21 | — |
| 25 | Pembuatan Robot AGV - · INTERNAL | Annisa Widya | Low | Engineering | Mar 13, 2667d late | 1/7 | 1/9 | 5/5 | — |
| 26 | Kelinci Mas - GI SIlae & Unaaha Kelinci Mas Unggul PT · PPC | Muhamad Adam | Low | Production | May 18, 261d late | 2/7 | 3/9 | 23/28 | 35% |
| 27 | Demo/Mockup Panel Typetest Cubic, Eaton MV, Eaton LV - · INTERNAL | Annisa Widya | Low | Engineering | Aug 31, 26104d | 0/18 | 1/21 | — | — |
| 28 | Internal - Mini Data Center Rack (MDCR) from Scheneider - · INTERNAL | Annisa Widya | Low | Engineering | Mar 27, 2653d late | 1/7 | 1/9 | 72/87 | — |
| 29 | Internal - Layout Penambahan Unit Mesin HSG - · INTERNAL | Annisa Widya | Low | Engineering | Feb 6, 26102d late | 0/7 | 0/9 | — | — |
| 30 | Internal - Persiapan Layout Produksi MV - · INTERNAL | Annisa Widya | Low | Engineering | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 31 | Internal - Pembuatan Program Proyek OKR/Internal Project - · INTERNAL | Annisa Widya | Low | Engineering | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 32 | Internal - Project ISO_27001 - · INTERNAL | Annisa Widya | Low | Engineering | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 33 | Internal - Program Estimator (Containment, Container, Smart Rack) - · INTERNAL | Susy Verawaty | Low | Engineering | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 34 | Internal - Automation Program CRM Section 1-4 - · INTERNAL | Susy Verawaty | Low | Engineering | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 35 | Internal - 29 Line Assembly - · INTERNAL | Annisa Widya | Low | Engineering | Feb 27, 2681d late | 0/0 | 0/0 | — | — |
| 36 | Internal - Perbaikan Loading/Unloading Area Pintu Belakang - · INTERNAL | Cahyarani Bratandari Suhardi | Low | Engineering | May 22, 263d | 0/7 | 0/9 | — | — |
| 37 | Internal - Skill Development (Training) HV - · INTERNAL | Annisa Widya | Low | — | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 38 | Review Product Presentation - Marketing Update - · INTERNAL | Annisa Widya | Low | — | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 39 | Pembuatan Arsip Master Dokumen Project - · INTERNAL | Annisa Widya | Low | — | Feb 27, 2681d late | 0/7 | 0/9 | — | — |
| 40 | Mega Akses - BDF Lippo Cikarang Mega Akses Persada PT · PPC | Raden Aldi Rizky Fadhilah | Low | Production | May 1, 2618d late | 2/4 | 0/0 | 176/232 | 36% |
| 41 | Moratel - DC Dist Site BSD SM+ Mora Telematika Indonesia, Tbk PT · PPC | May Sarah | High | Production | May 22, 263d | 3/6 | 4/8 | 78/104 | 66% |
| 42 | MSG - CMS Phase 2 - · PPC | Muhamad Adam | High | Customer | Mar 17, 2663d late | 2/5 | 0/9 | 17/26 | — |
| 43 | Siemens - UCC BP Tangguh Siemens Indonesia PT · PPC | May Sarah | High | Production | Jun 5, 2617d | 1/7 | 0/9 | 42/47 | 306% |
| 44 | Hitachi - ACP25053 - DSS Maumere 150kV Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | Production | Jul 7, 2649d | 3/4 | 2/4 | 188/229 | 5% |
| 45 | Intan Mufakat Raya - GIS 150 KV Gandul II/Pamulang Intan Mufakat Raya PT · PPC | Fatma Afira Heryani | Low | CustomerEngineering | Jun 10, 2622d | 0/7 | 0/9 | — | 0% |
| 46 | Schneider - Ariobimo Phase 2 Schneider Indonesia PT · PPC | May Sarah | High | Production | Mar 27, 2653d late | 4/4 | 5/6 | 112/133 | 19% |
| 47 | Inti Bumi Mas - Panel Feeder Inti Bumi Mas PT · PPC | Fatma Afira Heryani | Low | Customer | Jul 6, 2648d | 2/7 | 2/9 | 50/69 | 0% |
| 48 | Hitachi - ACP25076 - Single Phi Barru Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | Production | May 18, 261d late | 4/4 | 5/5 | 132/144 | 39% |
| 49 | Hitachi - ACP25070 - GI 150kV Gombong Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Low | Customer | May 18, 261d late | 3/3 | 4/4 | 165/184 | 31% |
| 50 | Schneider Electric - LNGPP Schneider Electric Systems Indonesia PT · PPC | May Sarah | Low | Production | Jul 13, 2655d | 0/0 | 0/0 | — | 526% |
| 51 | Moratel - POP Kebayoran Lama Mora Telematika Indonesia, Tbk PT · PPC | May Sarah | High | Customer | May 29, 2610d | 3/3 | 4/5 | 141/185 | 18% |
| 52 | PT. Vivandiere Technology Indonesia - Renovasi Gedung Data Center BNPT - Sentul Vivandiere Technology Indonesia PT · PPC | Raden Aldi Rizky Fadhilah | Low | CustomerEngineering | Jun 1, 2613d | 0/4 | 1/8 | 205/330 | 0% |
| 53 | Hitachi - ACP26008 - GIS 150kV JIIPE BKMS Tenant Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | EngineeringCustomer | May 29, 2610d | 4/7 | 4/9 | 129/144 | 6% |
| 54 | Moratel - Site Kuala Tungkal Mora Telematika Indonesia, Tbk PT · PPC | May Sarah | Low | Engineering | Jun 3, 2615d | 3/3 | 3/5 | 159/233 | 44% |
| 55 | Mega Akses - STECME BDF Power POP Gedong Reloc Ps. Rebo Mega Akses Persada PT · PPC | Raden Aldi Rizky Fadhilah | Low | Customer | Jul 24, 2666d | 0/0 | 0/0 | 143/163 | 14% |
| 56 | Siemens - Marvel - · PPC | May Sarah | Low | Engineering | Apr 28, 2621d late | 4/4 | 0/0 | 13/14 | 3% |
| 57 | PT. Tekno Infrastruktur Sukses_MOCKUP_BPO Tekno Infrastruktur Sukses PT · PPC | Susy Verawaty | High | ProductionQC | May 22, 263d | 2/7 | 1/9 | 137/192 | 32% |
| 58 | Hitachi - ACP25029 - GI Tolinggula 150kV - · PPC | Fatma Afira Heryani | High | — | May 15, 264d late | 3/3 | 3/4 | 38/42 | 28% |
| 59 | EEI - MK GI Paringin Energi Entelemi Indonesia PT · PPC | Fatma Afira Heryani | Low | — | Jun 29, 2641d | 1/4 | 1/4 | — | — |
| 60 | Moratel - Site Wisma Mandiri 2 Mora Telematika Indonesia, Tbk PT · PPC | May Sarah | High | Engineering | Jul 31, 2673d | 2/4 | 3/5 | 92/128 | — |
| 61 | Moratel - Karawang New Phase 2 Mora Telematika Indonesia, Tbk PT · PPC | May Sarah | Medium | Engineering | Jul 31, 2673d | 2/3 | 3/5 | 108/139 | — |
| 62 | Yanghong Konstruksi Indonesia - Containment BDX CGK3A Yanghong Konstruksi Indonesia PT · PPC | Muhamad Adam | High | EngineeringProduction | May 9, 2610d late | 3/7 | 2/9 | 61/74 | 15% |
| 63 | Mega Akses - BDF Sudirman Condominium - · PPC | Raden Aldi Rizky Fadhilah | High | Engineering | May 15, 264d late | 0/0 | 0/0 | 108/125 | — |
| 64 | INTERNAL-Ruang Meeting Smart Room - · INTERNAL | Cahyarani Bratandari Suhardi | Low | — | Apr 13, 2636d late | 0/7 | 0/9 | — | — |
| 65 | Wang Jun - Fiberhome - E06F10 CABINET (90x470x370) Wang Jun Other · PPC | Fatma Afira Heryani | High | — | Apr 28, 2621d late | 0/7 | 0/9 | 2/3 | — |
| 66 | Mega Akses - Omadata Surabaya - · PPC | Raden Aldi Rizky Fadhilah | High | — | Jul 31, 2673d | 0/7 | 0/9 | 87/101 | — |
| 67 | Kelinci Mas Unggul - Panel MK Single Phi Kelinci Mas Unggul PT · PPC | Muhamad Adam | Medium | Engineering | Jun 10, 2622d | 3/7 | 4/9 | — | — |
| 68 | Moratel - CLS Mandalika Mora Telematika Indonesia, Tbk PT · PPC | Muhamad Adam | High | Customer | Jun 8, 2620d | 0/7 | 3/9 | 141/181 | — |
| 69 | Moratel - Graha 9 Phase 2 Mora Telematika Indonesia, Tbk PT · PPC | Muhamad Adam | High | Customer | Jun 15, 2627d | 0/7 | 0/9 | — | — |
| 70 | Mega Akses - Colocation Space Rack Tj. Bemban Gedung Baru - · PPC | Raden Aldi Rizky Fadhilah | High | — | Apr 30, 2619d late | 0/7 | 0/9 | 20/27 | — |
| 71 | Omadata - Closed Rack 19inch 42U Omadata Padma Indonesia PT · PPC | Muhamad Adam | Medium | Production | Jun 19, 2631d | 0/7 | 0/9 | — | — |
| 72 | Mega Akses - POP Pemurus Dalam Banjarmasin - · PPC | Raden Aldi Rizky Fadhilah | High | Production | May 7, 2612d late | 0/7 | 0/9 | 19/19 | — |
| 73 | Hitachi - ACP25085 - Sebuku PLN NPC Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | Medium | Customer | Jul 6, 2648d | 3/7 | 1/9 | — | — |
| 74 | PT. Tekno Infrastruktur Sukses_Batch 1.1 - · PPC | Susy Verawaty | Medium | Production | Jun 2, 2614d | 0/7 | 0/9 | 137/195 | 0% |
| 75 | Hitachi - ACP26018 - GI KM17 Borneo Indobara Hitachi Sakti Energy Indonesia PT · PPC | Fatma Afira Heryani | High | Customer | Jun 23, 2635d | 2/4 | 0/4 | 39/42 | — |
| 76 | Mega Akses Persada - BDF Power BDF Cikutra Mega Akses Persada PT · PPC | Raden Aldi Rizky Fadhilah | High | Production | Jul 31, 2673d | 0/7 | 0/9 | 144/162 | — |
| 77 | Taybo - Rack Server 52U_Mockup - · PPC | Annisa Widya | Low | Customer | May 11, 268d late | 0/7 | 0/9 | — | — |
| 78 | GT Ladang Teknik - Personnel Mobilization GT Ladang Teknik PT · PPC | Raden Aldi Rizky Fadhilah | High | — | Jul 31, 2673d | 0/7 | 0/9 | 8/9 | — |
| 79 | JKT2 Anex Data Center - Rack 45U & Basic PDU - · PPC | Adinda Diva Nurintan Putri Irawan | High | ProductionCustomer | Jun 19, 2631d | 0/7 | 0/9 | — | — |
| 80 | Hexa Daya Solusi - Rack 48U Hexa Daya Solusi PT · PPC | Adinda Diva Nurintan Putri Irawan | Low | — | May 22, 263d | 0/7 | 0/9 | — | — |
| 81 | Wholesale - Panel DB - Dermaga Biak Wholesale Electric Asia Indonesia PT · PPC | Fatma Afira Heryani | Low | Customer | May 13, 266d late | 0/7 | 0/9 | — | — |
| 82 | Multipolar TMS - Relokasi Rectifier - · PPC | Muhamad Adam | Low | Warehouse | Jun 30, 2642d | 0/7 | 0/9 | 24/24 | — |
Project Department Progress